Building Permit
Occupancy Permit
Electrical Permit
Para sa mga gustong kumuha ng building permit.
| CHECKLIST OF REQUIREMENTS | WHERE TO SECURE |
|---|---|
| A.) Kapag ang aplikante ay nakarehistrong nagmamay-ari ng lupa: | |
| Certified true copy of T.C.T | Client |
| Certified true copy of tax declaration | Assessor’s Office |
| Current real property tax declaration | Assessor’s Office |
| Barangay clearance (as needed) | Respective Barangay |
| Zoning clearance and locational clearance | Municipal Planning and Development Office |
| Fire clearance | Bureau of Fire Protection, Malasiqui |
| Other clearance (from DENR, DOH, ATO, etc. as needed) | Government Agencies Concerned |
| Consent of neighbors (as needed) | Client |
| B.) Kapag ang aplikante ay hindi ang may-ari ng lupa: | |
| Notarized copy of contract lease | Client |
| Notarized copy of deed of absolute sale | Client |
| Notarized copy of contract of sale | Client |
| Notarized copy of consent of lot owner | Client |
| 2. Limang (5) set ng plano, bill of material at specifications prepared, napirmahan at natatakan ng: | |
| A duly licensed architect or civil engineer (architecture and structure plans) | Client |
| A duly licensed sanitary engineer or master plumber (plumbing or sanitary installation plans) | Client |
| A duly licensed professional electrical engineer (electrical plans) | Client |
| A duly licensed professional mechanical engineer (mechanical plans) | Client |
| Bill of materials and specification signed and sealed by licensed architect or civil engineer conformed by the owner | Client |
| CLIENT STEPS | AGENCY ACTIONS | FEES TO BE PAID | PROCESSING TIME | PERSON RESPONSIBLE |
|---|---|---|---|---|
| 1. Magbigay ng form (building, electrical at sanitary) | 1. Tumanggap ng application kasama ang kompletong requirement | None | 10 minuto | Administrative Aide III – Engineering Office |
| 2. Magbigay at mag-file ng form para sa locational clearance | 2. Tanggapin at suriin | None | 10 minuto |
Administrative Aide III – Municipal Planning and Development Office Bill Collector – Treasury Office |
| 3. Mag-file ng application para sa fire clearance. Magbayad at tumanggap ng O.R. |
2.1. Mag-endorso ng 1-set plan 2.2. Suriin ang mga plano at basahin ang mga dapat bayaran, kukunin ang opisyal na permit at magbibigay ng fire clearance |
None | 10 minuto |
Municipal Engineer – Engineering Office S/Insp. Jovencio C. Ilumin – Fire Marshall |
| 4. Ipakita ang fire clearance sa opisina ng Business One Stop Shop |
3.1. Suriin ang mga plano at espesipikasyon sa pagkuha at kinakailangan sa
National Building Code (PD 1096) 3.2. Tayahin ang bayad para sa building permit |
None |
20 minuto 10 minuto |
Engineer I – Engineering Office Administrative Aide III – Engineering Office |
| 5. Magbayad sa opisina ng Municipal Treasurer | 4. Tatanggap ng bayad at magbibigay ng resibo | Kompyutasyon ng building permit fee mula sa Engineering Office | 10 minuto | Bill Collector I – Treasury Office |
| 6. Ipakita ang O.R. at tanggapin ang building permit | 5. Magbibigay ng building permit | None | 30 minuto | Municipal Engineer – Engineering Office |
Ang certificate of occupancy ay dapat secure bago ang aktuwal na pag saklaw ng gusali.
| CHECKLIST OF REQUIREMENTS | WHERE TO SECURE |
|---|---|
| 1. Sertipikasyon ng pagkumpleto – para sa gusali, elektrikal at sanitary, may lagda at tatak ng engineer-in-charge sa konstruksiyon | Client |
| 2. Talaan | Client |
| 3. Sertipiko ng Kaligtasan sa Sunog (Fire Safety Certificate) mula sa Bureau of Fire Protection | Bureau of Fire Protection, Malasiqui |
| CLIENT STEPS | AGENCY ACTIONS | FEES TO BE PAID | PROCESSING TIME | PERSON RESPONSIBLE |
|---|---|---|---|---|
| 1. Magbigay ng sertipikasyon ng pagkumpleto na may lagda ng arkitekto at inhinyero | 1. Mag-endorso ng COC sa Bureau of Fire Protection | None | 10 minuto | Municipal Engineer – Engineering Office |
| 2. I-endorso ang nakumpletong proyekto para sa inspeksiyon | 2. Pag-inspeksiyon ng proyekto kasama ang FSC at tagasuri ng gusali | None | 1 hanggang 4 na oras (depende sa layo ng lugar) |
S/Insp. Jovencio C. Ilumin – Fire Marshall Engineer I – Engineering Office Administrative Aide III – Engineering Office |
| 3. Magbayad ng FSC fee | 3. Tatanggap ng bayad at mag-iisyu ng O.R. | None | 5 minuto | S/Insp. Jovencio C. Ilumin – Fire Marshall |
|
4.1. Ipakita ang FSC / Apply for Certificate of Occupancy (COO) 4.2. Pagtanggap ng Order of Payment |
4.1. Tatanggap ng bayad at mag-iisyu ng resibo 4.2. Assesses fees and charges |
None |
3 minuto 5 minuto |
Municipal Engineer – Engineering Office |
| 5. Magbayad ng COO fee at tumanggap ng opisyal na resibo | 5. Tatanggap ng bayad at mag-iisyu ng O.R. | Bill of materials × 0.01% | 5 minuto | Bill Collector I – Treasury Office |
| 6. Ipakita ang resibo | 6. Ipakita ang Certificate of Occupancy | None | 10 minuto | Administrative Aide III – Engineering Office |
| Tanggapin ang COO | 7. Magbibigay ng Certificate of Occupancy | None | 10 minuto | Municipal Engineer – Engineering Office |
Para sa pag apply ng electrical permit
| CHECKLIST OF REQUIREMENTS | WHERE TO SECURE |
|---|---|
| Form na naka-notaryo at may pirma at tatak ng Professional Electrical Engineer | Client |
| CLIENT STEPS | AGENCY ACTIONS | FEES TO BE PAID | PROCESSING TIME | PERSON RESPONSIBLE |
|---|---|---|---|---|
| 1. Mag-aplay ng electrical permit | 1. Magbigay ng form para sa electrical | None | 5 minuto | Administrative Aide III – Engineering Office |
| 2. Magpasa ng notarized form na may pirma at tatak ng Professional Electrical Engineer | 2. Pag-inspeksiyon ng kable sa tahanan | None | Isang beses kada isang linggo | Administrative Aide III – Engineering Office |
| 3. Maghintay ng komputasyon ng babayaran | 3. Assesses fees and charges |
Lighting outlets – 1.50 / outlet Tumbler switch – 1.50 / tumbler Convenience outlet – 1.50 / C.O. Safety switch – 2.00 / unit Circuits – 1.00 / circuit Electrical meter fee: Residential – 15.00 / Commercial – 30.00 Wiring fee: Residential – 10.00 / Commercial – 40.00 Aircon – 60.00 / unit |
5 minuto | Administrative Aide III – Engineering Office |
| 4. Kumuha ng FSC at bayaran ang kinakailangang bayarin | 4. Magbigay ng FSC at opisyal na resibo | None | 5 minuto | S/Insp. Jovencio C. Ilumin – Fire Marshall |
| 5. Ipakita ang FSC at O.R.; tanggapin ang electrical permit | 5. Mag-isyu ng naaprubahang electrical permit | None | 3 minuto | Municipal Engineer – Engineering Office |